Is Your Editorial Office Ready for 2030? Watch the Webinar.

Watch Now!
Case Study

Optimizing Book Production Efficiency with Integra’s Workflow Solutions

Optimizing Book Production Efficiency with Integra’s Workflow Solutions featured

A prominent academic publisher specializing in Science, Technology, and Medicine titles sought to dramatically enhance production efficiency to stay competitive. Faced with prolonged production schedules and the imperative to maintain quality, they turned to Integra for innovative workflow solutions.

Read the case study to explore the impactful results achieved:

  • Reduced first proof delivery time from 10 days to 6 days.

  • Cutting overall book production time from 180 days to 150 days.

  • Integrated advanced technology for streamlined typesetting and editing processes.

Download Case Study

    Please complete the form below. The case study will be sent to your email shortly.





    View More Case Study

    Secondary-level ELT Course Versioning Under Tight Timelines and Curriculum Change

    Read Case Study

    Starter-Level ELT Program for British and American English Curricula

    Read Case Study

    Creating Question-Level Granularity for AI-Driven Item Selection

    Read Case Study

    Rapid Translation Support for Professional Learning Content

    Read Case Study